This shows a few different stages of the build from hanging up in the paint shop ready for its primer coating to showing how it gets assembled into the completed oil tank Cover.
More of the oil bay cover parts hung in spray booth.
Finished panel with oil filler flap open showing the rubber seal bonded in place. The hinge and two Dzus studs are visible on the bottom side of the flap.
Fitted cover with the gunsight slot visible near the top.